Infrastructure
Vielha tunnel. South portal
For centuries, the Val d’Aran remained virtually cut off during the winter, when heavy snowfall blocked the mountain passes and hampered communication with the rest of the peninsula. To solve this problem, work began in the early 20th century on the construction of a large tunnel beneath the mountain. After numerous delays and technical difficulties, the Viella-Alfonso XIII Tunnel was finally opened in 1948. Measuring 5,260 metres in length, it was at the time one of the greatest engineering feats ever undertaken in the Pyrenees and ensured that the route remained open all year round.
Decades later, rising traffic volumes and the need to improve safety standards made it necessary to build new infrastructure. And so the Vielha-Juan Carlos I Tunnel was opened in 2007. This new tunnel, approximately 5,230 metres long, runs parallel to the old one and is equipped with modern ventilation, lighting and traffic control systems, as well as emergency exits, ensuring much safer travel.
Both galleries are connected by cross-passages that allow for evacuation in case of emergency. Whilst the modern tunnel handles the bulk of road traffic, the old tunnel is used as a service and emergency route, as well as allowing certain types of special transport to pass through.